Share:
What Smart Building IoT Really Delivers for Commercial Real Estate Costs ROI and Operational Reality
Published: December 2025 | Reading Time: 24 minutes
Key Takeaways
- Full smart building retrofit costs $3-8 per square foot; new construction adds $1-3/sq ft – Budget realistically for hardware, software, and integration services across 2-3 year implementation
- Energy savings of 15-25% are realistic; claims of 40%+ require unusual starting conditions – Honest benchmarks show meaningful but modest improvements, not marketing miracles
- Tenant satisfaction improvements rarely justify cost alone—energy and operations savings must carry the ROI – Tenant apps and experience features are nice-to-have, not business case drivers
- Most projects should start with HVAC and lighting (80% of the savings, 40% of the complexity) – Focus delivers the fastest payback before adding advanced features
- Payback periods of 3-5 years are normal; claims of 12-18 months are usually cherry-picked examples – Set realistic expectations with stakeholders for sustainable long-term value
- Phased implementation over 2-3 years reduces risk and proves value incrementally – Avoid "big bang" approaches that delay benefits and increase failure risk
What "Smart Building" Actually Means
The term "smart building" covers a wide range of capabilities with dramatically different costs and complexity. Understanding these levels helps scope realistic projects.
| Level | What's Included | Typical Cost/Sq Ft |
|---|---|---|
| Basic Automation | Programmable thermostats, scheduled lighting timers | $0.50-1.50 |
| Connected Systems | Centralized BMS, remote monitoring, basic analytics dashboards | $1.50-3.00 |
| Integrated Smart | Occupancy-based HVAC/lighting, predictive maintenance alerts | $3.00-5.00 |
| Advanced Intelligence | AI optimization, digital twin modeling, full system integration | $5.00-8.00+ |
Reality check: Most "smart building" retrofit projects aim for Level 2-3 (Connected to Integrated Smart). Level 4 (Advanced Intelligence) is rare except for flagship properties, new trophy construction, or institutional portfolios with dedicated innovation budgets.
Organizations implementing real estate management software should align smart building technology levels with property class and competitive positioning.
The Cost Breakdown: 100,000 Sq Ft Office Building
I. Hardware and Sensors
1. HVAC Intelligence
| Component | Quantity | Cost Range |
|---|---|---|
| Smart thermostats/controllers | 50-100 units | $15K-$40K |
| Duct sensors (temperature/airflow) | 100-200 sensors | $10K-$25K |
| VAV box controllers | 30-60 units | $20K-$50K |
| HVAC subtotal | $45K-$115K |
2. Lighting Control
| Component | Quantity | Cost Range |
|---|---|---|
| Smart switches/dimmers | 200-400 units | $20K-$60K |
| Occupancy sensors | 100-200 units | $8K-$20K |
| Daylight harvesting sensors | 20-40 units | $4K-$10K |
| Lighting subtotal | $32K-$90K |
3. Environmental Monitoring
| Component | Quantity | Cost Range |
|---|---|---|
| Air quality sensors (CO2, PM2.5) | 30-50 units | $12K-$30K |
| Temperature/humidity monitors | 50-100 units | $5K-$15K |
| Water leak detection sensors | 20-40 units | $3K-$8K |
| Environmental subtotal | $20K-$53K |
4. Access and Security
| Component | Quantity | Cost Range |
|---|---|---|
| Smart access controllers | 20-40 doors | $25K-$60K |
| Occupancy analytics systems | 10-20 zones | $8K-$20K |
| Access subtotal | $33K-$80K |
5. Infrastructure
| Component | Quantity | Cost Range |
|---|---|---|
| Network equipment (switches, APs) | Building-wide | $15K-$40K |
| Edge computing gateways | 2-5 units | $5K-$15K |
| Infrastructure subtotal | $20K-$55K |
Hardware Total: $150K-$393K
II. Software and Platform Costs
| Component | Year 1 Cost | Annual Ongoing |
|---|---|---|
| Building management platform | $6K-$15K | $4K-$10K |
| Energy analytics software | $3K-$6K | $2K-$5K |
| Tenant experience app | $4K-$10K | $3K-$6K |
| Predictive maintenance module | $3K-$6K | $2K-$4K |
| Integration middleware/APIs | $5K-$13K | $1K-$4K |
| Software Total | $21K-$50K | $12K-$29K |
Organizations implementing IoT development services should evaluate whether to build custom platforms or leverage commercial building management systems (BMS).
III. Implementation Services
| Activity | Cost Range |
|---|---|
| Assessment and system design | $6K-$13K |
| Installation (sensors, controllers) | $15K-$38K |
| Programming and configuration | $10K-$25K |
| Integration (BMS, existing systems) | $8K-$20K |
| Commissioning and testing | $5K-$10K |
| Training (facilities, tenants) | $3K-$6K |
| Services Total | $47K-$112K |
Professional custom software development teams can accelerate integration and reduce costly rework during implementation.
Total 3-Year Investment Summary
| Category | Year 1 | Year 2 | Year 3 | 3-Year Total |
|---|---|---|---|---|
| Hardware | $270K | $25K | $25K | $320K |
| Software | $36K | $21K | $21K | $78K |
| Services | $80K | $8K | $8K | $96K |
| Total | $386K | $54K | $54K | $494K |
Per square foot: $9.80 over 3 years, or $3.27/sq ft/year
This aligns with industry benchmarks for Level 2-3 smart building retrofits on mid-rise office buildings.
The ROI Reality Check
I. Energy Savings (The Main Event)
Energy cost reduction is the primary ROI driver for smart building investments. Realistic benchmarks based on 25+ implementations:
| Baseline Energy Spend | Realistic Savings % | Annual Savings (100K sq ft) |
|---|---|---|
| $2.50/sq ft/year ($250K) | 15-20% | $37K-$50K |
| $3.00/sq ft/year ($300K) | 18-22% | $54K-$66K |
| $3.50/sq ft/year ($350K) | 20-25% | $70K-$87K |
Critical note: Savings percentages depend heavily on baseline efficiency. Buildings with old, inefficient systems see bigger gains (20-25%). LEED-certified buildings or recently renovated properties might only improve 8-12% because they're already optimized.
Organizations managing building maintenance operations should conduct energy audits to establish accurate baselines before projecting savings.
II. Operations Savings
Beyond energy, smart building technology reduces operational costs through improved efficiency:
| Category | Typical Savings | Annual Value (100K sq ft) |
|---|---|---|
| Reduced HVAC service calls | 20-30% fewer | $8K-$15K |
| Lighting maintenance reduction | 15-25% fewer | $3K-$6K |
| Faster issue identification | 30-40% time savings | $5K-$10K |
| Staff time optimization | 10-20% efficiency | $10K-$20K |
| Operations Total | $26K-$51K |
For properties implementing facility maintenance software, integration with smart building platforms amplifies operational efficiency gains.
III. Tenant Benefits (Harder to Quantify)
| Benefit | Potential Value | How It Materializes |
|---|---|---|
| Higher satisfaction scores | Premium rents? | Maybe 1-3% rent premium if market supports |
| Improved retention | Reduced turnover costs | $50K-$200K per avoided vacancy |
| Competitive differentiation | Faster lease-up | Situation-dependent, market-specific |
| ESG reporting capability | Investor requirements | Often mandatory for institutional investors |
Honest assessment: Tenant benefits are real but extremely hard to attribute to smart building technology specifically versus location, amenities, management quality, and market conditions. Don't count on them to close your ROI gap—treat them as strategic enablers, not financial justifiers.
IV. Realistic ROI Calculation
Scenario: 100,000 sq ft Class B office building, $3.00/sq ft baseline energy cost
1. Energy Savings Only
| Year | Investment | Energy Savings | Cumulative Net |
|---|---|---|---|
| 1 | $710K | $50K (half-year) | -$660K |
| 2 | $135K | $115K | -$680K |
| 3 | $135K | $120K | -$695K |
| 4 | $135K | $125K | -$705K |
| 5 | $135K | $125K | -$715K |
Wait—that's still negative? Yes, if you only count energy savings.
2. Energy + Operations Savings
| Year | Investment | Total Savings | Cumulative Net |
|---|---|---|---|
| 1 | $710K | $70K | -$640K |
| 2 | $135K | $155K | -$620K |
| 3 | $135K | $160K | -$595K |
| 4 | $135K | $165K | -$565K |
| 5 | $135K | $170K | -$530K |
| 6 | $0 | $175K | -$355K |
| 7 | $0 | $180K | -$175K |
| 8 | $0 | $185K | +$10K |
Reality: Many smart building projects don't achieve positive ROI within 5 years based on hard savings alone. They're justified by:
• Regulatory compliance (energy reporting mandates, building performance standards)
• Tenant expectations in competitive Class A markets
• Portfolio-wide efficiency initiatives across institutional holdings
• ESG commitments for sustainable building certifications
• Long-term (10+ year) returns aligning with property hold periods
For real estate operations managing multi-property portfolios, these strategic benefits often outweigh individual property ROI timelines.
What Actually Delivers Value
1. High-Impact, Lower-Cost Improvements
Focus on these for fastest payback and highest ROI:
| Improvement | Cost Range | Typical Savings | Payback Period |
|---|---|---|---|
| Smart thermostat scheduling | $15-40K | 5-10% energy | 18-30 months |
| Occupancy-based HVAC | $40-80K | 8-15% energy | 24-36 months |
| LED lighting + daylight harvesting | $50-100K | 20-30% lighting costs | 24-36 months |
| Demand response integration | $10-25K | 3-8% energy + utility incentives | 12-24 months |
| Fault detection (HVAC) | $20-40K | 5-10% energy + maintenance | 18-30 months |
The 80/20 rule: These five improvements deliver 80% of potential savings with 40% of the complexity compared to comprehensive smart building implementations.
Organizations implementing cloud development services can build scalable platforms that start with high-ROI features and expand incrementally.
2. Lower-Impact, Higher-Cost Features
Be cautious about these—they're impressive but rarely justify their cost:
| Feature | Cost Range | Value Proposition | Recommendation |
|---|---|---|---|
| Full digital twin | $100K+ | Impressive demos, limited daily operational value | Skip unless new construction |
| Tenant experience app | $40-80K | Nice-to-have, typically 20-40% adoption that declines | Only for Class A competing for premium tenants |
| Advanced air quality monitoring | $30-60K | Post-COVID interest, limited ROI beyond code compliance | Meet code requirements, don't over-invest |
| Smart parking sensors | $50-100K | Useful only in severely constrained parking situations | Situation-specific, not universal |
3. The Recommended Phased Approach
For most commercial buildings, implement in this sequence:
Phase 1 (Year 1): Foundation
- HVAC optimization and controls (50% of savings potential)
- Basic monitoring and analytics (enables everything else)
- Network infrastructure upgrade
- Investment: $300-500K | Annual savings: $40-70K
Phase 2 (Year 2): Lighting and Expansion
- Lighting control and automation (25% of savings potential)
- Fault detection and diagnostics
- Expand HVAC coverage
- Investment: $200-350K | Annual savings: $60-100K
Phase 3 (Year 3): Advanced Features
- Predictive maintenance
- Tenant experience app (if justified)
- Advanced environmental monitoring
- Investment: $150-250K | Annual savings: $70-110K
This phased approach delivers value incrementally, funds later phases from earlier savings, and reduces implementation risk.
Organizations managing education facilities or hospitality properties benefit from similar phased approaches tailored to operational patterns.
Implementation Mistakes to Avoid
Mistake 1: Trying to Do Everything at Once
The problem: 18-month project, $1.5M budget, massive coordination complexity across all building systems. Something always slips, costs overrun, and stakeholders lose confidence before seeing any benefits.
Better approach: Phase over 2-3 years. HVAC optimization in Year 1, lighting in Year 2, advanced features in Year 3. Each phase delivers measurable value and generates savings to fund the next phase. Smaller bites reduce risk and build organizational capability progressively.
Mistake 2: Ignoring Existing BMS
The problem: "Our Building Management System is 15 years old—let's replace everything with a modern platform!" = 3x the cost, 2x the timeline, massive operational disruption, and angry tenants.
Better approach: Most BMS systems installed in the past 15 years can be integrated with modern IoT platforms. Add intelligence and analytics on top rather than ripping out functional infrastructure. Save replacement for end-of-life systems or major renovations.
Mistake 3: Choosing Proprietary Ecosystems
The problem: Vendor lock-in means you can't add best-of-breed components later. You're stuck with one vendor's roadmap, pricing, and service quality. Exit costs become prohibitive.
Better approach: Require open protocols (BACnet, Modbus, REST APIs) in vendor selection. Accept slightly higher initial cost (5-10%) for long-term flexibility. Open standards enable competitive bidding for expansions and prevent vendor leverage on renewals.
Organizations implementing AI and machine learning solutions benefit from open platform architectures that enable custom analytics development.
Mistake 4: Underestimating Network Requirements
The problem: IoT sensors generate constant traffic—thousands of devices reporting every minute. Building networks designed for desktop computers and printers can't handle the load. Performance degrades, sensors lose connection, and the entire system becomes unreliable.
Better approach:
- Conduct network capacity assessment before hardware selection
- Budget for network infrastructure upgrades if needed (often $30-80K for 100K sq ft)
- Plan for dedicated IoT network segments separate from tenant/guest networks
- Ensure adequate edge computing capacity for local processing
Mistake 5: Forgetting About Ongoing Maintenance
The problem: Sensors fail. Batteries die. Software needs updates. Network equipment requires patches. Nobody budgeted for ongoing maintenance—within 18 months, 20% of sensors are offline and nobody's fixing them.
Better approach:
- Plan for 10-15% of initial hardware cost annually for sensor replacement, battery changes, and repairs
- Budget for software subscription renewals (often increasing 5-10% annually)
- Establish maintenance contracts with vendors or train internal staff
- Include remote monitoring to catch failures before they cascade
Organizations using IT asset management software can track smart building component lifecycles and maintenance schedules systematically.
Technology Platform and Vendor Considerations
1. Building Management System (BMS) Vendors
| Vendor | Strengths | Best For |
|---|---|---|
| Johnson Controls | Comprehensive portfolio, strong service network | Large portfolios, enterprise accounts |
| Honeywell | Reliable, proven systems, good integration | Mixed-use properties, existing Honeywell base |
| Siemens | Engineering excellence, European strength | International portfolios, engineering-focused |
| Schneider Electric | Energy management focus, strong analytics | Sustainability-driven projects, energy optimization |
2. IoT Platforms
| Platform | Strengths | Best For |
|---|---|---|
| AWS IoT | Scalable, flexible, broad ecosystem | Tech-forward organizations, custom development |
| Azure IoT | Microsoft integration, enterprise features | Microsoft shops, enterprise IT standards |
| Proprietary BMS platforms | Integrated solution, single vendor support | Simplicity preference, single-vendor relationship |
Organizations leveraging web application development expertise can build custom dashboards and analytics on top of standard BMS platforms.
3. Lighting Control
| Vendor | Strengths | Best For |
|---|---|---|
| Lutron | Premium quality, excellent dimming | Class A properties, quality-focused |
| Enlighted | Occupancy analytics, data-driven | Workspace optimization, analytics-heavy |
| Legrand | Cost-effective, good integration | Value properties, budget-conscious |
Property Type Considerations
1. Office Buildings
Priorities: Occupancy-based HVAC, lighting automation, tenant experience
Typical savings: 18-25% energy, strong operational efficiency gains
Special considerations: Multiple tenants require zone-level control, after-hours access management
2. Retail
Priorities: Customer comfort, branding consistency, energy costs
Typical savings: 15-20% energy, focus on HVAC and lighting
Special considerations: Extended operating hours, high foot traffic variability, visual merchandising lighting requirements
Organizations implementing retail point-of-sale systems can integrate with building systems for coordinated operations.
3. Hospitality
Priorities: Guest comfort, energy savings during unoccupied periods
Typical savings: 20-30% energy (high from occupancy-based controls)
Special considerations: Guest expectations for comfort override efficiency, privacy concerns with occupancy sensing
For hotel management platforms, integration with smart building creates seamless guest experiences while optimizing operations.
4. Multi-Family Residential
Priorities: Common area efficiency, tenant sub-metering, amenity management
Typical savings: 12-18% energy (limited by individual unit control)
Special considerations: Tenant privacy, split incentives (owner pays for equipment, tenants see utility savings)
5. Mixed-Use
Priorities: Zone-specific optimization, retail/office/residential coordination
Typical savings: Variable by zone (15-25% overall)
Special considerations: Complex scheduling, multiple stakeholder needs, diverse operational patterns
The Bottom Line
Smart building technology is mature, proven, and capable of delivering real value—but the ROI isn't as fast or large as marketing materials suggest.
Most Buildings Should Expect:
- 15-25% energy savings (not the marketed 40%)
- 3-5 year payback period (not the cherry-picked 18 months)
- $3-5/sq ft total investment for comprehensive implementation (not $1/sq ft starter pricing)
- 18-24 month implementation timeline for phased approach (not 3-month turnkey)
Projects That Succeed:
✔ Start focused – HVAC and lighting first, before advanced features
✔ Implement in phases over 2-3 years with incremental value delivery
✔ Set realistic expectations with stakeholders on costs and timeline
✔ Measure rigorously against verified utility data, not vendor dashboards
✔ Integrate with operations – technology serves facility teams, doesn't replace them
Projects That Struggle:
✘ Try to do everything at once
✘ Count on tenant experience features to justify costs
✘ Expect marketing-promised ROI timelines
✘ Skip baseline data collection and proper measurement
✘ Choose proprietary ecosystems without open standards
Choose smart building technology when:
- Building size justifies fixed implementation costs (50K+ sq ft)
- Current systems are inefficient (pre-2010 equipment)
- Energy costs are significant ($2.50+/sq ft annually)
- You have a 3-5 year commitment to the property
- Stakeholders have realistic ROI expectations
The goal isn't to chase every shiny feature—it's to nail the basics first and expand strategically based on proven value.
Ready to Evaluate Smart Building Technology for Your Property?
Don't navigate IoT implementation alone. Get expert guidance based on your specific building characteristics, tenant needs, and financial goals.
Get a Free Smart Building Assessment →
Explore Our IoT Development Services →
Read Smart Building Success Stories →
Visit Our Blog for Real Estate Technology Insights →
Discover Our Real Estate Software Solutions →
Cost and savings benchmarks based on 25+ commercial smart building implementations by AgileSoftLabs across office, retail, hospitality, and mixed-use properties since 2017. Our IoT development services and custom software solutions help commercial real estate owners, REITs, and property management firms implement realistic smart building strategies that deliver measurable ROI aligned with property class, tenant expectations, and investment timelines—prioritizing practical operational improvements over technology showcase features.
Frequently Asked Questions
1. What's the minimum building size where smart building technology makes sense?
Generally, 50,000+ square feet for comprehensive smart building systems. Below that threshold, simpler solutions (smart thermostats, basic lighting control, standalone analytics) offer better ROI.
Why: The fixed costs of IoT platforms, integration services, and network infrastructure don't scale down well. A 20,000 sq ft building pays similar integration costs as a 50,000 sq ft building but has half the savings to offset them.
Alternatives for smaller buildings: Start with programmable thermostats, LED lighting, and basic occupancy sensors. These deliver 60-70% of potential savings at 20-30% of the cost.
2. New construction or retrofit—which is more cost-effective?
New construction costs 40-60% less per square foot because you're not retrofitting existing systems, avoiding demolition and working around occupancy constraints.
Typical costs:
- New construction: $1-3/sq ft for an integrated smart building
- Retrofit: $3-8/sq ft for equivalent capability
However, retrofit ROI can actually be higher because you're improving inefficient baseline systems. New construction starts efficiently, so percentage improvements are smaller.
Best case scenario: Major renovation where you're touching building systems anyway—you get near-new-construction pricing with retrofit-level baseline inefficiency to improve.
3. How long does implementation take?
Realistic timelines by complexity level:
- Basic automation: 2-3 months
- Connected systems: 4-6 months
- Integrated smart (Level 3): 8-12 months
- Advanced intelligence: 12-18 months
Important caveats:
- Occupied buildings take 30-50% longer than vacant ones due to coordination constraints
- Multiple tenant buildings add 20-30% timeline for coordination
- Integration with legacy systems adds 2-4 months if systems are proprietary or poorly documented
Organizations using project management software track implementation milestones and coordinate across vendors more effectively.
4. Do tenants actually use smart building apps?
Honest answer: Adoption is typically 20-40% in the first 3 months and declines after the launch novelty wears off to 10-20% active users.
Why low adoption:
- Tenants have app fatigue (too many single-purpose apps)
- Core building systems work without app interaction
- Features often duplicate what tenants already have (room booking, visitor management)
- Login/authentication friction reduces usage
Recommendation: Don't make tenant apps central to your business case. They're nice-to-have for Class A properties competing for premium tenants who expect technology amenities, but don't count on adoption-dependent ROI.
Focus on operational systems (HVAC, lighting) that deliver value regardless of tenant interaction.
5. What about cybersecurity risks?
Real concern. Building systems have historically been air-gapped (physically isolated from internet). Connecting them creates an attack surface for:
- Ransomware targeting building operations
- Data breaches of occupancy patterns, access logs
- Physical security system compromise
- Environmental system manipulation
Security requirements to budget for:
- Network segmentation (separate building systems from IT networks)
- Access controls and authentication (multi-factor, role-based)
- Regular security patching and firmware updates
- Penetration testing (annual minimum for sensitive properties)
- Incident response planning specific to building systems
Add 10-15% to the project cost for security done right—not as an afterthought checklist, but designed in from the architecture phase.
6. Which vendors should we consider?
Building Management Systems:
- Johnson Controls, Honeywell, Siemens, Schneider Electric – Large, established, reliable, strong service networks
- Choose based on existing building systems and regional service availability
IoT Platforms:
- AWS IoT, Azure IoT for flexibility and custom development
- Proprietary BMS vendor platforms for simplicity and single-vendor support
Lighting Control:
- Lutron (premium), Enlighted (analytics-focused), Legrand (value)
Start with your existing BMS vendor for the easiest integration and leverage existing service relationships. Only consider platform replacement if current systems are truly end-of-life or creating operational problems.
7. Can we implement in phases?
Yes—and you absolutely should. Phased implementation is the recommended approach for most retrofit projects.
Recommended sequence:
Phase 1: Core network infrastructure + HVAC monitoring and basic control
Phase 2: Lighting automation + expand HVAC coverage
Phase 3: Environmental monitoring + predictive maintenance
Phase 4: Advanced analytics and AI optimization
Phase 5: Tenant experience features (if justified)
Each phase should deliver standalone value and ideally generate enough savings to partially fund the next phase. This approach:
- Reduces implementation risk
- Proves value before major investment
- Allows course correction based on learnings
- Builds organizational capability progressively
8. What data do we need to collect before starting?
Essential baseline data (12 months minimum):
✔ Utility bills (electric, gas, water) with hourly/daily granularity if available✔ Maintenance work orders categorized by system (HVAC, lighting, controls)
✔ Tenant comfort complaints are logged systematically
✔ Occupancy data if available (badge access, visitor logs)
✔ Equipment inventory with age, condition, and maintenance history
✔ Operating schedules for each tenant and common areas
Why 12 months: Captures seasonal variation, eliminates anomalies, enables accurate savings calculation.
Without baseline data, you cannot prove savings. Start collecting now even if project implementation is a year away.
Organizations implementing building maintenance software establish systematic data collection that supports both operations and future smart building initiatives.
9. How do we measure success?
Primary metric: Energy Use Intensity (EUI) – kWh per square foot, tracked monthly and compared to baseline
Secondary metrics:
- Maintenance cost per square foot (should decrease)
- Tenant satisfaction scores (should improve or stay stable)
- System uptime percentage (should increase)
- Mean time to repair (should decrease)
Critical: Don't rely solely on vendor dashboards showing savings. Verify against actual utility bills monthly. Many dashboards calculate theoretical savings that don't materialize in actual consumption.
Establish baseline, target, and stretch goals before implementation. Report progress quarterly to stakeholders with verified utility data.
10. What if our building has multiple tenants with separate HVAC systems?
This complicates implementation but doesn't prevent it. Smart building benefits remain achievable with the right approach.
Options:
Option 1: Tenant-level sub-metering
- Each tenant sees their actual energy consumption
- Incentivizes tenant participation in efficiency
- Requires utility cost allocation in the lease structure
- Added cost: $5K-15K per tenant space
Option 2: Master system with tenant overrides
- Central optimization with tenant control authority
- Balances efficiency with tenant comfort autonomy
- Most common approach for a multi-tenant office
Option 3: Common area focus only
- Optimize lobbies, corridors, parking, and shared spaces
- Lower savings potential (30-40% of total)
- Simpler implementation with no tenant coordination
Multi-tenant buildings typically add 20-30% complexity to projects for coordination, zone isolation, and individual comfort management. Budget accordingly.
Organizations managing multi-tenant properties benefit from operations management software that coordinates across diverse stakeholder needs.

.png)
.png)
.png)
.png)



